Engineering News – Heat Recovery from Wastewater (2:24)

This week`s episode is about the West Gate Bridge Collapse (5:24). The builders used an unusual construction method (8:45), which ultimately led to the collapse (15:30) of the bridge. But they weren’t the only ones struggling with box girder bridge construction (22:30).

 

Transcript / Photos / Sources from this episode - https://www.failurology.ca/p/22-west-gate-bridge-collapse/

 

Ways to get in touch

Twitter - https://twitter.com/failurology

Email - [email protected]

Linked In - https://www.linkedin.com/company/failurology-podcast

Website – www.failurology.ca

YouTube - https://www.youtube.com/channel/UCh1Buq46PYyxKbCDGTqbsDg

Twitter Mentions