Learning notes from this episode:

 

Outsourcing can be done in 3 ways: with an agency (focus on design), a development shop (focus on engineering) or a product studio (holistic approach to the entire product). Make sure whoever you hire uses agile methodology and adapts the product specifications as you learn. An MVP should take no more than 6 - 8 weeks to develop. Knowing this can help you plan your costs.

 

Say hi to Igor Moliver on LinkedIn.

 

To join future Tech for Non-Techies events, sign up to our newsletter.

 

To join the free live training on The Non-Technical Founder's Introduction to Tech on 21 September 2020, click here.

 

Say hi to Sophia on Twitter.

Twitter Mentions