Dan Buelow continues his discussion with Dale Muhall, Director of Construction Phase Services for LEO A DALY. Part I of this two-part podcast series on shop drawings reviewed Dale’s AIA Best Practices article “Why We No Longer ‘Stamp’ Shop Drawings,” and the misconceptions, risks and errors surrounding basic construction administration procedures. In part II, Dan reviews a series of questions raised by design professionals on this same topic during a recent WTW A&E webinar with Dale.