This month’s Pipeline Technology Podcast episode sponsored by Pipeline & Gas Journal features Denise Earles of Pipesurvey USA discussing her company’s 27-day-long ILI run and how they worked through low pressure and low flow obstacles to produce accurate results.

In this month’s episode, you will learn why the run took 27 days and how low pressure and low flow caused other issues, such as paraffin buildup and having to calculate the batteries for the ILI tool to run properly over that long period of time.

- Access the show notes and full episode transcript at PipelinePodcastNetwork.com.